Header image

AD IAB AT I C AIR INLET L COO IN G cooler naturally SAVING ENERGY, TIME & MONEY WITHOUT COSTING THE EARTH Reduce electrical running costs by 44 UP TO % Typical payback period 21 weeks from installation, no more than 1 cooling season Retrotted to any make/model of Air Cooled Chiller, Rooftop unit or Air Cooled unit 79% less water used than any other wet system No still water reservoir design eliminates health risk Protection against snow and sand storms No water softeners or chemical treatment plant required Extends compressor reliability and life Maintenance free, with no need for replacement nozzles or meshes NO MORE air cooled chillers or condensers cutting out on really warm days! info@ecomesh.com | www.ecomesh.com 46 June 2019 www.cibsejournal.com p46.CIBSEMagJUL19.indd 46 19/06/2019 13:48